Tolt Trail Restoration Work Party Part II

In Ride Report by Hawkens

A big THANK YOU! to everyone that attended the first Tolt Restoration Party. Great progress had been made on The Phoenix.

DSC_8245 DSC_8243 DSC_8241 DSC_8237 DSC_8236 DSC_8233 DSC_8232 DSC_8231

Now onto the second restoration party.

The route is flagged and time for us to roll up our sleeves and start clearing the route. Initial work is to clear the slash along the new route. The Tolt Trail system has taken several hits with the recent logging operations and appreciate that Green Crow is allowing us to go in and reclaim these lost trails.

We will meet at the Large Parking lot across from the Soccer fields and head up at 9AM. Look for a Black Dodge Truck.  Then bike up to where we'll be working.

If you arrive late head up IAB and take the left at the five way (East Road) and follow the road to the right. Continue straight through the intersection to West Road and make a right you should see us in the clear cut to your right or look for pink flags.

Stay as long or short as you’d like, I plan to be there from 9AM to 1PM.

Sign up at Evergreen Mountain Bike Alliance

What to bring:

  • Water, lunch, snack and a pack to haul it in
  • Work boots or tough hiking boots (sturdy footwear)
  • Rain gear, layers, work attire
  • Safety glasses and work gloves if you have them
  • A McLeod if you have one
  • A Pruning Saw (If you have one)

ToltBurnRestoration2_Evergreen